| For
most of my adult life I had thought about someday building my Dream
Home. Several years ago I finally got the chance. I had purchased a
lake front lot with a small cottage on it. My initial intention was to
use the property "as is", and someday raze the old cottage and build a
new home in its place. After a couple of weekends in the musty old camp
I came to the conclusion that I needed to speed up my timetable.
Part
of the dream in building my own home was to act as the General
Contractor and to personally supply a great deal of sweat equity. I
accomplished both of these goals, however it was not easy. There were
many roadblocks and bends in the road along the way. In the subsequent
parts of this chronology, I will review my experiences in hopes that
others may gain from my experiences.
Determining
the Home Style and Size
After making the
decision to raze the cottage and build a new home, I had to first
determine what type and size of home to build. My lot was limited in
size and required careful planning to ensure that I would meet all of
the setbacks governed by the town I lived in. Although I had these concerns, I decided to forgo the Architect
route. I deemed it too expensive and probably not necessary for the
style of home I wanted to build. Instead I picked up a handful of Home
Plan magazines and surfed the internet for home designs. I also picked
up an inexpensive software package for designing homes and floorplans.
After a week of reviewing home plans, I found one that met most of my
requirements in terms of a floorplan. The footprint was smaller than I
wanted, but I concluded that I could redraw the floor plan accordingly
using my newly purchased Home Design Software Package.
The
Home Design Software package was not as simple to use as the
instruction manual implied, however after a couple of weeks I had a
floorplan with all the dimensional information.
Assuming
the role as the General Contractor
As I
had indicated earlier, one of my goals was to assume the role as
General Contractor on this project. I quickly learned that banks frown
upon lending construction mortgages to everyday homeowners and to folks
who have little professional building experience. I got around this
issue by deciding not to use the banks for financing. However, from
what I learned later, it may have been possible for me to assume a
construction mortgage if I had quit my day job and applied for the loan
as a "full time General Contractor". Indeed, I would have needed to
complete a full proposal to the bank with all costs and subcontractors
identified, but this is necessary anyways.
As the
General Contractor I developed a build schedule and task list. Some of
the top items included: Identifying subcontractors, pulling permits,
and having a septic design approved.
Carefully
Pick your Sub-Contractors
Identifying the
right subcontractors is the most important task a General Contractor
performs. Poor selection of subcontractors can lead to delays in
schedules, cost overruns, poor workmanship and strife between the
various subcontractors on the job. Prior to hiring subcontractors, it
is important to visit their current jobsites. Review their work on
existing jobsites and mingle with the other subs to judge the working
relationship. In addition get two or three reference checks on the
subcontractors. If there are poor workmanship, personality issues, or
references move on. Do not settle for second rate subs, even if it
means slipping your schedule or costs goals, as you will more than
likely suffer even larger schedule slips or higher costs by hiring the
wrong people.
Pulling Permits
Once
you have selected and hired your excavator, chief framer, and
foundation company, review with them your plans. Make sure you walk the
site with them, and carefully stake out the house footprint, paying
careful attention to lot setbacks, septic tanks, leach fields and well
location. Once all are agreed upon with the house plans and the
location of the home, contact the building inspector and review with
him/her your plans. You will need to submit a very thorough package to
the building inspector prior to getting approval. There are frequently
town and state forms that need to be filled out regarding wetlands, and
home thermal analysis. In addition, detailed engineering drawings of
the proposed home may be required. In my case the Framer was able to
assist in developing additional sketches of the house plan to ensure
structural compliance to local, state and federal building codes. If I
had used the initial home plans I had obtained, those would have been
sufficient. I also could have contacted an architect with my selected
plans to provide additional details, however it was not necessary in my
case.
After about a week and several hundred dollars
later I had the permit to build a new home.
Septic Design
My
home required its own septic system on site. As a result, I required a
septic design and an associated permit for the new home. I recommend
pursuing this as early as possible in any new home project as this can
take up to 2-3 months to complete as both town and state approvals are
required, not to mention site and engineering work.
Without
knowing exactly where the septic system and tank will reside, it may be
difficult to locate the exact position of the home and in many cases
the building inspector may not approve the building permit until the
septic design permit has been obtained. I was fortunate in that the
property already had a small septic system on the lot, so the building
inspector gave me approval. I was at financial risk, however, in the
event the new septic design was not approved or needed to be
repositioned from the proposed location. Fortunately that was not the
case and I was able to move forward on razing the cottage and beginning
site work.
To Be Continued ..
In
Part 2 of "Building Your Dream House", I will cover razing an existing
building, performing site prep work, and pouring foundation walls. Stay
tuned.....
About
the AuthorMe_Donovan@comcast.net www.homeadditionplus.com
Over
the past 20+ years Mr. Donovan has been involved with building homes
and home additions. Mr. Donovan's formal education & profession
have been as an Electrical Engineer & Marketing Manager.
Mark Donovan
Do you Want to be the boss of your family's new
custom dream home project, and legally pay for everything with someone
else's credit card?
If you answered "Yes,
I Do!", then you have my permission to read this entire web
page ... Click Here to find out how |
|
|
|